Commercial solar projects in Ireland
This is a reference list of 84 commercial solar installations in Ireland, each with its size, installer, year and source. The largest is Eli Lilly, Kinsale at 9.6 MW. 30 are 1 MW or bigger. A second list covers 390 on-site schemes from the national planning register.
What are the largest commercial solar installations in Ireland?
| Site | County | Size | Installer | Year |
|---|---|---|---|---|
| Eli Lilly, Kinsale | Cork | 9.6 MW | Enerpower, now Greenvolt Next | 2021 |
| Dublin Airport (daa) | Dublin | 9 MW | Enerpower / Greenvolt Next | 2025 |
| Tirlán, Ballyragget | Kilkenny | 8 MW | ESB Smart Energy Services | 2025 |
| Dew Valley Foods, Thurles | Tipperary | 7.8 MW | ESB Smart Energy Services | 2023 |
| MSD Ballydine | Tipperary | 7.3 MW | ESB Smart Energy Services | 2022 |
| Mannok, Cavan | Cavan | 6 MW | Activ8 Solar Energies | 2026 |
| Arrabawn Co-op, Nenagh | Tipperary | 5.8 MW | Astatine | 2024 |
| Dale Farm, Cookstown | Tyrone (NI) | 4.9 MW | CES Energy | 2017 |
| Belfast International Airport | Antrim (NI) | 4.8 MW | Lightsource | 2016 |
| Liffey Meats, Ballyjamesduff | Cavan | 4.5 MW | Activ8 Solar Energies | |
| Sanofi, Waterford | Waterford | 4 MW | Greenvolt Next | 2025 |
| Bombardier wing plant, Belfast | Antrim (NI) | 3.6 MW | SALIIS Renewables | 2014 |
| Carey Glass, Nenagh | Tipperary | 2.7 MW | ESB Smart Energy Services | 2023 |
| Gyproc (Saint-Gobain), Kingscourt | Cavan | 2.5 MW | Activ8 | 2026 |
| Guerbet, Dublin | Dublin | 2.4 MW | Enerpower by Greenvolt | 2022 |
Sizes are as the source states them. Sites in Northern Ireland are marked NI. Supermarket chains that fit panels across many stores are counted in the full list below, not here: Lidl Ireland stores (programme), 20 MW; Aldi Ireland stores (programme), 6.3 MW; Tesco Ireland stores (programme), 5 MW.
Which sectors install the most solar?
| Sector | Projects listed | Largest | Size |
|---|---|---|---|
| Pharma and medtech | 9 | Eli Lilly, Kinsale | 9.6 MW |
| Food and drink | 16 | Tirlán, Ballyragget | 8 MW |
| Manufacturing | 19 | Mannok, Cavan | 6 MW |
| Supermarkets and retail | 10 | Lidl Ireland stores (programme) | 20 MW |
| Warehouses and logistics | 6 | Sam Dennigan & Co, Oldtown | 1.5 MW |
| Airports and ports | 5 | Dublin Airport (daa) | 9 MW |
| Hotels and leisure | 5 | Dromoland Castle Hotel | 292 kW |
| Offices | 4 | Fexco | 188 kW |
| Car dealerships | 3 | Windsor Motor Mall (Nissan), Dublin | 113 kW |
| Public sector | 9 | Causeway Hospital, Coleraine | 1.2 MW |
| Stadiums and arenas | 3 | SSE Arena / Odyssey Complex, Belfast | 420 kW |
Each sector page lists every project in it, the planning applications for that kind of building and why solar suits it.
What do businesses say they save?
53 of the 84 projects have a published cost, saving, payback or share of electricity. These are the figures the business or its installer gave. Nobody has audited them.
- Eli Lilly, Kinsale9.6 MW
- Cost
- $5 million (phase 1 only, snippet)
- Share of use
- 20%
- Output
- almost 6 GWh (phase 1 only, snippet)
Source: Greenvolt Next
- Dublin Airport (daa)9 MW
- Share of use
- 10% to 13%
- Output
- 7 to 9 GWh a year
Source: Greenvolt Next
- Tirlán, Ballyragget8 MW
- Share of use
- 34% of imported electricity
- Output
- about 7.6 GWh a year
Source: ESB
- Dew Valley Foods, Thurles7.8 MW
- Share of use
- up to 40% in non-winter months
Source: ESB
- MSD Ballydine7.3 MW
- Share of use
- up to 20%
- Output
- about 7.9 GWh a year
Source: ESB
- Aldi Ireland stores (programme)6.3 MW
- Cost
- €5 million
- Share of use
- about 30% per store
- Output
- 95,500 to about 100,000 kWh per store a year
Source: pv magazine
Show 47 more projects
- Arrabawn Co-op, Nenagh5.8 MW
- Cost
- €3.5 million
- Share of use
- about 15%
- Output
- 5,400 MWh a year
Source: TechBuzz Ireland
- Tesco Ireland stores (programme)5 MW
- Share of use
- up to about 20% per store
Source: Greenvolt Next
- Dale Farm, Cookstown4.9 MW
- Share of use
- about 20%
Source: Irish Farmers Journal
- Belfast International Airport4.8 MW
- Share of use
- about 27%
Source: Lightsource bp
- Liffey Meats, Ballyjamesduff4.5 MW
- Cost
- €3 million to €3.1 million
- Output
- 2.29 million kWh (with the wind turbine)
Source: Agriland
- Sanofi, Waterford4 MW
- Share of use
- around 20%
- Output
- about 3.2 GWh a year
Source: Greenvolt Next
- Bombardier wing plant, Belfast3.6 MW
- Cost
- around £3.5 million
- Share of use
- around a quarter
- Output
- about 3,000 MWh a year
Source: Downing
- Carey Glass, Nenagh2.7 MW
- Share of use
- up to 13%
- Output
- about 2.4 GWh a year
Source: ESB
- Gyproc (Saint-Gobain), Kingscourt2.5 MW
- Saving
- about €230,000 a year
- Share of use
- up to 15%
- Output
- about 2,235 MWh a year
Source: ThinkBusiness
- Guerbet, Dublin2.4 MW
- Share of use
- about 18%
- Output
- about 2 million kWh a year
Source: Greenvolt Next
- Astellas, Damastown2.2 MW
- Share of use
- 27%
Source: Greenvolt Next
- Bulmers (C&C Group), Clonmel2 MW
- Share of use
- 10%
Source: C&C Group
- Cork Airport, Holiday Blue car park1.7 MW
- Share of use
- about 20%
- Output
- more than 1.5 GWh a year
Source: Greenvolt Next
- PepsiCo, Little Island1.6 MW
- Cost
- €2.4 million
- Share of use
- over 20%
Source: Echo Live
- Kingspan Environmental, Portadown1.3 MW
- Share of use
- 30% of daytime demand
- Output
- 1.1 to 1.3 GWh a year
Source: Specification Online
- Dexcom, Athenry1.2 MW
- Share of use
- a third at peak (radio blurb)
- Output
- estimated 1.0 to 1.1 GWh a year
Source: LinkedIn
- Shannon Airport1.2 MW
- Cost
- €3.6 million
- Share of use
- up to 20%
Source: The Shannon Airport Group
- Causeway Hospital, Coleraine1.2 MW
- Cost
- £1.2 million
- Saving
- about £141.7k in the first year
- AMS (Architectural & Metal Systems), Little Island993 kW
- Saving
- €200,000+ (project page); €300,000 (commercial page)
- Output
- about 862.6 MWh a year
- Payback
- about 5 years
Source: PV Generation
- Kyte Powertech, Cavan950 kW
- Share of use
- 20%
Source: UrbanVolt
- Blanchardstown Centre815 kW
- Share of use
- over 40%
- Output
- 689,593 kWh a year
Source: TechCentral
- Tayto Snacks, Ashbourne772 kW
- Cost
- €1.17 million
- Share of use
- about 10%
- Output
- about 667 MWh a year
Source: ThinkBusiness
- Tricel, Killarney750 kW
- Share of use
- 25%
- Output
- 776,000 kWh (PV Europe); Tricel cites 561,000 kWh displaced
Source: Tricel
- Butlers Chocolates, Clonshaugh420 kW
- Share of use
- about 14% of base load
- Output
- more than 350,000 kWh a year
Source: Checkout
- McGowans Print350 kW
- Share of use
- 25%
Source: UrbanVolt
- Techcrete, Balbriggan320 kW
- Saving
- €45,000 a year
- Payback
- 5.5 years
Source: Alternative Energy Ireland
- Wicklow County Council, County Buildings300 kW
- Share of use
- sized to 40% of building load
- Output
- 265,800 to 285,000 kWh a year
Source: Wicklow County Council
- Dromoland Castle Hotel292 kW
- Saving
- up to €50,000 a year
- Share of use
- over 20%
Source: LONGi
- Manhattan Peanuts, Finglas275 kW
- Share of use
- 40%
Source: UrbanVolt
- HPC Group260 kW
- Share of use
- 32%
Source: UrbanVolt
- NVD, Baldonnel257 kW
- Share of use
- about 25%
- Payback
- 3 years (installer promise)
Source: Alternative Energy Ireland
- IJM Timber250 kW
- Share of use
- 26%
Source: UrbanVolt
- Wexford Viking Glass180 kW
- Share of use
- 22%
Source: UrbanVolt
- Cedarwood Furniture180 kW
- Share of use
- 35%
Source: UrbanVolt
- The Montenotte Hotel, Cork140 kW
- Cost
- €150,000
- Share of use
- expected 34% cut in energy use
- Output
- about 140 MWh a year
- Payback
- 2.8 years
Source: PV Generation
- Folens70 kW
- Share of use
- 44%
Source: UrbanVolt
- Burgmann Packings66 kW
- Share of use
- 53%
Source: UrbanVolt
- Adare Manor60 kW
- Saving
- €9,300 a year
- Payback
- 4.2 years
Source: Alternative Energy Ireland
- Peter Hurley Warehousing, Ballinasloe37 kW
- Output
- about 30,481 kWh a year
- Payback
- 2.2 years
Source: Electric Skyline
- Hyland Shipping35 kW
- Share of use
- 56%
Source: UrbanVolt
- 9 White Deer Brewery30 kW
- Share of use
- about 36%
- Output
- 24,667 kWh a year
Source: SEAI
- Dawn Meats, Grannagh
- Cost
- €1.5 million
- Share of use
- 40%
- Output
- 1,560,000 kWh a year
- Payback
- 4.5 years depending on unit prices
Source: Checkout
- Musgrave NI (9 sites)
- Cost
- £3 million
Source: Checkout
- Lidl distribution centre, Newbridge
- Cost
- €1 million
- Share of use
- over 25%
- Output
- 1,011,929 kWh a year
Source: Leinster Leader
- Sligo Park Hotel
- Saving
- over €25,000 a year
Source: Travel Extra
- Fitzgeralds Woodlands House Hotel, Adare
- Saving
- €74,907 a year
Source: Irish Hotels Federation
- Uisce Éireann, Thurles treatment plant
- Share of use
- 10% cut in imports
- Output
- 83,264 kWh a year
Source: Uisce Éireann
For what a system of your size should cost, see commercial solar panel cost. Sports clubs have their own comparison on solar panels for sports clubs.
Which installers have built the most?
| Installer | Projects listed | Largest listed project |
|---|---|---|
| Greenvolt Next (formerly Enerpower) | 21 | Lidl Ireland stores (programme), 20 MW |
| UrbanVolt | 11 | Kyte Powertech, Cavan, 950 kW |
| Activ8 Solar Energies | 6 | Mannok, Cavan, 6 MW |
| ESB Smart Energy Services | 5 | Tirlán, Ballyragget, 8 MW |
| Pinergy SolarElectric | 4 | Defence Forces, Casement Aerodrome Hangar 5, 358 kW |
| Alternative Energy Ireland (AEI) | 4 | Techcrete, Balbriggan, 320 kW |
| PV Generation | 2 | AMS (Architectural & Metal Systems), Little Island, 993 kW |
| SolarCo | 2 | Tipperary Boutique Distillery, 50 kW |
This counts projects with a published source that names the installer, so it favours firms that publish case studies. It is not a ranking of quality. Where two firms are credited, the project counts for the first named.
All commercial solar projects
| Source | ||||
|---|---|---|---|---|
| Lidl Ireland stores (programme)Supermarkets and retail, 2017 | 20 MW | Greenvolt Next (formerly Enerpower) | Greenvolt Next | |
| Eli Lilly, KinsalePharma and medtech, 2021 | Cork | 9.6 MW | Enerpower, now Greenvolt Next | Greenvolt Next |
| Dublin Airport (daa)Airports and ports, 2025 | Dublin | 9 MW | Enerpower / Greenvolt Next | Greenvolt Next |
| Tirlán, BallyraggetFood and drink, 2025 | Kilkenny | 8 MW | ESB Smart Energy Services | ESB |
| Dew Valley Foods, ThurlesFood and drink, 2023 | Tipperary | 7.8 MW | ESB Smart Energy Services | ESB |
| MSD BallydinePharma and medtech, 2022 | Tipperary | 7.3 MW | ESB Smart Energy Services | ESB |
| Aldi Ireland stores (programme)Supermarkets and retail, 2025 | 6.3 MW | Greenvolt Next | pv magazine | |
| Mannok, CavanManufacturing, 2026, under construction | Cavan | 6 MW | Activ8 Solar Energies | Engineers Ireland |
| Danone, MacroomFood and drink, planned | 6 MW | Not named | ||
| Arrabawn Co-op, NenaghFood and drink, 2024 | Tipperary | 5.8 MW | Astatine | TechBuzz Ireland |
| Tesco Ireland stores (programme)Supermarkets and retail, 2025 | 5 MW | Greenvolt Next | Greenvolt Next | |
| Dairygold, MitchelstownFood and drink, planned | 5 MW | Not named | Agriland | |
| Dale Farm, CookstownFood and drink, 2017 | Tyrone (NI) | 4.9 MW | CES Energy | Irish Farmers Journal |
| Belfast International AirportAirports and ports, 2016 | Antrim (NI) | 4.8 MW | Lightsource | Lightsource bp |
| Liffey Meats, BallyjamesduffFood and drink | Cavan | 4.5 MW | Activ8 Solar Energies | Agriland |
5 of these are announced or planned and are marked. The rest are reported as built or under construction.
What does the planning register show?
The national planning register holds 390 applications to 30 September 2026 for solar panels that supply a business, public building or other premises on its own site. Councils granted 331 and refused 2.
| Measure | Figure |
|---|---|
| Applications for on-site solar | 390 |
| Granted | 331 |
| Refused | 2 |
| Roof-mounted | 255 |
| Ground-mounted | 97 |
| Capacity granted, across the 134 that state a size | 37.2 MW |
| Busiest year | 2022, with 109 applications |
| Named sites confirmed built by a published report | 28 |
Applications peaked in 2022. In October of that year the planning exemptions for solar were widened, and most rooftop systems stopped needing permission. The register now mainly shows ground arrays, carports and sites near airports.
| Site | County | Size applied for | Status | Planning record |
|---|---|---|---|---|
| Mondelez (Cadbury's chocolate factory) | Dublin | 1.8 MW | Granted | 2023, ref 3878/23 |
| Cork Airport | Cork | 1.7 MW | Granted | 2024, ref 2443516 |
| Adare Manor Hotel and Golf Resort | Limerick | 1.3 MW | Under construction | 2024, ref 2460189 |
| Western Brand Chicken | Mayo | 970 kW | Granted | 2022, ref 22733 |
| Ballymore Eustace Water Treatment Plant | Kildare | 880 kW | Granted | 2022, ref 221371 |
| Cavanhill Water Treatment Plant | Louth | 840 kW | Granted | 2024, ref 2460066 |
| Zimmer Biomet | Galway | 820 kW | Under construction | 2022, ref 2260104 |
| Boyne Valley Meats | Meath | 800 kW | Granted | 2025, ref 2560454 |
| Takeda Ireland | Wicklow | 636 kW | Granted | 2023, ref 2360076 |
| KCETB | Kilkenny | 600 kW | Granted | 2026, ref 2660382 |
Show 20 more granted schemes
| Site | County | Size applied for | Status | Planning record |
|---|---|---|---|---|
| Cregg Village | Sligo | 600 kW | Under construction | 2023, ref 2360250 |
| EI Electronics | Clare | 565 kW | Built | 2022, ref 22773 |
| NSC Campus | Cork | 496 kW | Granted | 2023, ref 2341906 |
| Oldleighlin Quarry | Carlow | 428 kW | Granted | 2022, ref 22238 |
| Ballyhandle Quarry | Cork | 420 kW | Granted | 2026, ref 26/0801 |
| Dunshaughlin Water Treatment Plant | Meath | 415 kW | Granted | 2024, ref 2460084 |
| Osberstown Wastewater Treatment Plant | Kildare | 325 kW | Granted | 2022, ref 221343 |
| Ballyboden Water Treatment Plant | Dublin | 260 kW | Granted | 2024, ref SD24A/0069W |
| Kellymount Quarry | Kilkenny | 258 kW | Granted | 2022, ref 22399 |
| Collins SuperValu, Carrigaline | Cork | 236 kW | Built | 2022, ref 22/4892 |
| West Pier Pumping Station | Dublin | 235 kW | Granted | 2024, ref D24A/0140 |
| Avoncourt Packaging | Cork | 216 kW | Granted | 2022, ref 2241608 |
| Arthurstown Landfill | Kildare | 200 kW | Granted | 2024, ref 2460958 |
| Castletown Tara Wastewater Treatment Plant | Meath | 200 kW | Granted | 2022, ref 221449 |
| Avoncourt Packaging | Cork | 199 kW | Granted | 2021, ref 2139886 |
| Holdensrath Quarry | Kilkenny | 196 kW | Granted | 2022, ref 22400 |
| SuperValu, Loughrea Shopping Centre | Galway | 192 kW | Granted | 2019, ref 19333 |
| Shelbourne Hall, RDS | Dublin | 175 kW | Built | 2019, ref 3272/19 |
| Irish International Trading Corporation | Cork | 174 kW | Granted | 2023, ref 2342242 |
| Ballynahinch Castle Hotel | Galway | 170 kW | Built | 2023, ref 23186 |
"Granted" means the council gave permission. It does not mean the panels are on the roof. A scheme is shown as built only where a news report, the company or its installer says so. The size is the figure in the application, and the system that gets built is sometimes smaller.
How was this list put together?
- Projects: taken from news reports, company announcements and installers' own case studies. Each row names its source.
- Planning schemes: every application in the national planning register that mentions solar was read, and grid-scale solar farms and house extensions were removed.
- Cross-check: each named planning site was searched for a published report that it was built.
- Limits: the planning register does not name the applicant or the cost. Most rooftop systems since 2022 are not in it at all. Savings are as claimed.
Data last reviewed October 2026. Installers are named as the source reports them.