Commercial solar panels in Kildare
Commercial solar panels cost €600–€1,700 per kWp installed in Kildare, before VAT and the SEAI grant, which pays up to €325,200 for applications to 6 July 2027. 2 business and public sites in County Kildare are listed here with their system size and source. The largest is Finlay Motor Group, Naas at 60 kW. The planning register holds 23 on-site solar applications in Kildare, and 21 were granted.
How much does commercial solar cost in Kildare?
Prices and the SEAI grant are set nationally, so these figures apply in Kildare as anywhere else. Prices are before VAT at 23%, which a VAT-registered business claims back. Payback is typically 5 to 7 years.
| System | Installed cost | Standard grant | Cost after grant |
|---|---|---|---|
| 20 kWp | €18,000–€34,000 | €6,600 | €11,400–€27,400 |
| 50 kWp | €40,000–€75,000 | €12,600 | €27,400–€62,400 |
| 100 kWp | €70,000–€140,000 | €22,600 | €47,400–€117,400 |
| 200 kWp | €130,000–€180,000 | €42,600 | €87,400–€137,400 |
The grant is doubled, up to 45% of the invoice, for applications from 7 October 2026 to 6 July 2027. The cost guide has every size up to 500 kWp, and commercial solar grants explains the enhanced rate and how to apply.
Which businesses in Kildare have solar panels?
These are systems named in press, company or installer reports, up to October 2026. 1 is announced but not yet built.
| Site | Type | Size | Installer | Source |
|---|---|---|---|---|
| Lidl Maynoothplanned | Supermarkets and retail | 575 kW | Greenvolt Next | Greenvolt Next |
| Finlay Motor Group, Naas | Car dealerships | 60 kW | Pinergy SolarElectric | |
| Lidl distribution centre, Newbridge2019 | Warehouses and logistics | 4,364 panels | Enerpower | Leinster Leader |
What have businesses in Kildare saved?
These are the figures the business or its installer published. They have not been audited.
- Lidl distribution centre, Newbridge
- Cost
- €1 million
- Share of use
- over 25%
- Output
- 1,011,929 kWh a year
Source: Leinster Leader
What solar has been through planning in Kildare?
The national planning register has 23 applications for on-site solar at businesses and public buildings in Kildare, up to 30 September 2026. 21 were granted and 6 were for ground-mounted arrays. The largest granted with a stated size is Ballymore Eustace Water Treatment Plant at 880 kW. Most rooftop systems have not needed permission since October 2022, so far more have been installed than the register shows.
By type of premises: retail and supermarket 5, hotel and hospitality 4, water and utilities 3, factory and industrial 3, school and college 3, pharma and medtech 1.
| Site | Council | Size applied for | Status | Planning record |
|---|---|---|---|---|
| Ballymore Eustace Water Treatment PlantGround-mounted | Kildare County | 880 kW | Granted | 2022, ref 221371 |
| Osberstown Wastewater Treatment Plant | Kildare County | 325 kW | Granted | 2022, ref 221343 |
| Arthurstown LandfillGround-mounted | Kildare County | 200 kW | Granted | 2024, ref 2460958 |
| Clanard Court Hotel | Kildare County | 169 kW | Granted | 2022, ref 22838 |
| Unnamed retail and supermarket siteRooftop | Kildare County | 166 kW | Granted | 2022, ref 22926 |
| Unnamed siteRooftop | Kildare County | 120 kW | Granted | 2022, ref 221533 |
| Euro Quality CladdingRooftop | Kildare County | 119 kW | Awaiting decision | 2026, ref 2660598 |
| Clane Shopping CentreRooftop | Kildare County | 98 kW | Granted | 2021, ref 21499 |
| The Hazel HotelGround-mounted | Kildare County | 94 kW | Granted | 2024, ref 24357 |
| Unnamed factory and industrial siteRooftop | Kildare County | 80 kW | Withdrawn | 2022, ref 221067 |
| Athy Wastewater Treatment PlantGround-mounted | Kildare County | 70 kW | Granted | 2022, ref 22173 |
| McConvilles SuperValu, Millstream Shopping CentreRooftop | Kildare County | 63 kW | Granted | 2021, ref 21535 |
Show 11 more applications
| Site | Council | Size applied for | Status | Planning record |
|---|---|---|---|---|
| Kilkea CastleRooftop | Kildare County | 60 kW | Granted | 2022, ref 22668 |
| Kilkea CastleRooftop | Kildare County | 50 kW | Built | 2020, ref 201017 |
| Confey CollegeRooftop | Kildare County | 30 kW | Built | 2017, ref 17132 |
| Pfizer, NewbridgeGround-mounted | Kildare County | 1,400 m² | Granted | 2018, ref 18781 |
| Scoil Phadraig, ClaneRooftop | Kildare County | 130 m² | Granted | 2018, ref 181473 |
| Unnamed warehouse and logistics siteRooftop | Kildare County | 8,860 m² | Granted | 2019, ref 19472 |
| St. Wolstan's Shopping CentreRooftop | Kildare County | 640 m² | Granted | 2021, ref 21560 |
| SuperValu KilcockRooftop | Kildare County | 539 m² | Built | 2022, ref 22330 |
| Unnamed factory and industrial siteRooftop | Kildare County | 682 m² | Granted | 2022, ref 22549 |
| Clongowes Wood CollegeGround-mounted | Kildare County | Not stated | Built | 2023, ref 23615 |
| Lily O'Brien's Chocolates | Kildare County | 2,453 m² | Granted | 2025, ref 2575 |
"Granted" is permission to build, not proof that the panels went up.
Which sports clubs in Kildare have solar?
2 clubs and venues in Kildare have installed solar, and 3 more have funding or plans. The sports clubs guide covers the grants they used.
| Club | Sport | Size | Status | Source |
|---|---|---|---|---|
| Golf Ireland HQ, Carton Demesne, Maynooth | Golf | 30 kW | Installed | Irish Golfer |
| Kill GAA | GAA club | 15 kW | Installed | Hybrid Energy Group |
| Royal Curragh Golf Club | Golf | Not stated | Funded | Community Sport Facilities Fund allocation list (RTÉ-hosted) |
| Ballymore GAA | GAA club | 31 m2 array | Planned | Leinster Leader / Kildare Now |
| Milltown GAA | GAA club | 65 panels | Planned | Leinster Leader / Kildare Now |
Where to go next
- Commercial solar installation: the stages and what to check before hiring an installer
- Farm solar panels and the TAMS 3 grant, for farms in Kildare
- Commercial solar projects across Ireland
- Other counties: Dublin, Cork, Galway, Mayo, Westmeath