Skip to main content

Business and farm solar · Ireland

Commercial solar panels in Ireland

Commercial solar panels in Ireland cost €600–€1,700 per kWp installed. The SEAI grant is doubled to a maximum of €325,200 for applications from 7 October 2026 to 6 July 2027. A typical system pays for itself in 5 to 7 years.

Prices last reviewed October 2026

Commercial solar at a glance

Installed cost

€600–€1,700 per kWp

Before VAT and before the grant

SEAI grant

Up to €325,200

For applications to 6 July 2027

Payback

5 to 7 years

10 to 15% return a year

Bill saving

30 to 50%

Of the electricity bill

Commercial solar panel prices by system size

System sizeCost before grantStandard SEAI grantCost after grantGeneration per year
20 kWp€18,000–€34,000€6,600€11,400–€27,400About 17,000 kWh
50 kWp€40,000–€75,000€12,600€27,400–€62,400About 43,000 kWh
100 kWp€70,000–€140,000€22,600€47,400–€117,400About 86,000 kWh
200 kWp€130,000–€180,000€42,600€87,400–€137,400About 172,000 kWh
500 kWp€300,000–€400,000€87,600€212,400–€312,400About 430,000 kWh

Costs exclude VAT. Applications made before 6 July 2027 get a larger grant; see the cost page for those figures.

What is commercial solar?

Commercial solar is solar PV for a business, farm, school or public building. A home system is 3 to 6 kWp. A commercial system runs from 10 kWp to 1,000 kWp.

The business uses the electricity on site and exports any surplus. Each kWp generates about 860 kWh a year in Ireland. Businesses that use most of their electricity in daylight hours get the best return.

What size system does a business need?

BusinessTypical systemPanelsRoof area
Small office or shop10 to 20 kWp25 to 5050 to 100 m²
Restaurant or hotel20 to 50 kWp50 to 125100 to 250 m²
Warehouse or factory50 to 200 kWp125 to 500250 to 1,000 m²
Farm, dairy or tillage30 to 100 kWp75 to 250150 to 500 m²
School or community building20 to 50 kWp50 to 125100 to 250 m²
Manufacturing or food processing50 to 300 kWp125 to 750250 to 1,500 m²
Large industrial site or data centre200 to 1,000 kWp500 to 2,5001,000 to 5,000 m²

Rule of thumb: 1 kWp needs about 4 to 5 m² of roof.

Savings and payback

  • Payback: 5 to 7 years
  • Return: 10 to 15% a year
  • Bill saving: 30 to 50% of the electricity bill
  • Export income: about 19.5c per kWh for surplus
  • Lifespan: 25 to 30 years

A company can also write off 100% of the cost against profits in year one through the Accelerated Capital Allowance.

Planning permission

Roof-mounted commercial solar is exempt from planning permission with no cap on area, as long as the power is mainly used on site.

InstallationPlanningConditions
Roof-mounted, industrial buildingExempt, no area capNot above the ridge, and 2 m in from the edge of a flat roof
Roof-mounted, office, shop, hotel or other businessExempt, no area capWithin 15 cm of a pitched roof or 1.2 m of a flat roof
Inside a Solar Safeguarding ZoneExempt up to 300 m²Tell the council in writing within 4 weeks of starting
Ground-mountedExempt up to 75 m²No more than 2.5 m high, and not in front of the front wall
Protected structurePermission always needed

The exemptions are set out in the planning regulations of October 2022 (S.I. 493 of 2022).

Commercial solar guides

Commercial solar by county

Local projects, planning applications and sports clubs with solar in Dublin, Cork, Galway, Kildare, Mayo and Westmeath.

Common questions

Pricing a system for your business?

Get commercial solar quotes

Tell us about the building and an installer will price a system for it.

Step 1 of 3

Where are you at?