Commercial solar panels in Cork
Commercial solar panels cost €600–€1,700 per kWp installed in Cork, before VAT and the SEAI grant, which pays up to €325,200 for applications to 6 July 2027. 8 business and public sites in County Cork are listed here with their system size and source. The largest is Eli Lilly, Kinsale at 9.6 MW. The planning register holds 58 on-site solar applications in Cork, and 49 were granted.
How much does commercial solar cost in Cork?
Prices and the SEAI grant are set nationally, so these figures apply in Cork as anywhere else. Prices are before VAT at 23%, which a VAT-registered business claims back. Payback is typically 5 to 7 years.
| System | Installed cost | Standard grant | Cost after grant |
|---|---|---|---|
| 20 kWp | €18,000–€34,000 | €6,600 | €11,400–€27,400 |
| 50 kWp | €40,000–€75,000 | €12,600 | €27,400–€62,400 |
| 100 kWp | €70,000–€140,000 | €22,600 | €47,400–€117,400 |
| 200 kWp | €130,000–€180,000 | €42,600 | €87,400–€137,400 |
The grant is doubled, up to 45% of the invoice, for applications from 7 October 2026 to 6 July 2027. The cost guide has every size up to 500 kWp, and commercial solar grants explains the enhanced rate and how to apply.
Which businesses in Cork have solar panels?
These are systems named in press, company or installer reports, up to October 2026.
| Site | Type | Size | Installer | Source |
|---|---|---|---|---|
| Eli Lilly, Kinsale2021 | Pharma and medtech | 9.6 MW | Enerpower, now Greenvolt Next | Greenvolt Next |
| Cork Airport, Holiday Blue car park2027, under construction | Airports and ports | 1.7 MW | Greenvolt Next | Greenvolt Next |
| PepsiCo, Little Island2024 | Food and drink | 1.6 MW | Not named | Echo Live |
| AMS (Architectural & Metal Systems), Little Island2023 | Manufacturing | 993 kW | PV Generation | PV Generation |
| Munster Rugby, Virgin Media Park2024 | Stadiums and arenas | 255 kW | Pinergy | Pinergy |
| The Montenotte Hotel, Cork2026 | Hotels and leisure | 140 kW | PV Generation | PV Generation |
| UCC, ORB building extension2020 | Public sector | 42 kW | Not named | University College Cork |
| 9 White Deer Brewery | Food and drink | 30 kW | Not named | SEAI |
What have businesses in Cork saved?
These are the figures the business or its installer published. They have not been audited.
- Eli Lilly, Kinsale9.6 MW
- Cost
- $5 million (phase 1 only, snippet)
- Share of use
- 20%
- Output
- almost 6 GWh (phase 1 only, snippet)
Source: Greenvolt Next
- Cork Airport, Holiday Blue car park1.7 MW
- Share of use
- about 20%
- Output
- more than 1.5 GWh a year
Source: Greenvolt Next
- PepsiCo, Little Island1.6 MW
- Cost
- €2.4 million
- Share of use
- over 20%
Source: Echo Live
- AMS (Architectural & Metal Systems), Little Island993 kW
- Saving
- €200,000+ (project page); €300,000 (commercial page)
- Output
- about 862.6 MWh a year
- Payback
- about 5 years
Source: PV Generation
- The Montenotte Hotel, Cork140 kW
- Cost
- €150,000
- Share of use
- expected 34% cut in energy use
- Output
- about 140 MWh a year
- Payback
- 2.8 years
Source: PV Generation
- 9 White Deer Brewery30 kW
- Share of use
- about 36%
- Output
- 24,667 kWh a year
Source: SEAI
What solar has been through planning in Cork?
The national planning register has 58 applications for on-site solar at businesses and public buildings in Cork, up to 30 September 2026. 49 were granted and 11 were for ground-mounted arrays. The largest granted with a stated size is Cork Airport at 1.7 MW. Most rooftop systems have not needed permission since October 2022, so far more have been installed than the register shows.
By type of premises: retail and supermarket 12, factory and industrial 11, warehouse and logistics 5, food and drink processing 3, hotel and hospitality 2, filling station and motor trade 2.
| Site | Council | Size applied for | Status | Planning record |
|---|---|---|---|---|
| Cork Airport | Cork City | 1.7 MW | Granted | 2024, ref 2443516 |
| Unnamed warehouse and logistics siteRooftop | Cork County | 1.7 MW | Granted | 2019, ref 19/5219 |
| Unnamed warehouse and logistics siteRooftop | Cork City | 899 kW | Granted | 2022, ref 2241147 |
| Unnamed siteGround-mounted | Cork County | 750 kW | Granted | 2025, ref 25/5410 |
| Unnamed siteGround-mounted | Cork County | 750 kW | Invalid application | 2026, ref 26/0450 |
| Unnamed siteGround-mounted | Cork County | 750 kW | Invalid application | 2026, ref 26/2135 |
| Unnamed warehouse and logistics siteRooftop | Cork City | 744 kW | Granted | 2024, ref 2442663 |
| Unnamed factory and industrial siteRooftop | Cork County | 685 kW | Granted | 2022, ref 22/5993 |
| Trabolgan Holiday CentreGround-mounted | Cork County | 610 kW | Invalid application | 2026, ref 26/1314 |
| Unnamed factory and industrial siteRooftop | Cork City | 517 kW | Granted | 2022, ref 2240863 |
| NSC Campus | Cork City | 496 kW | Granted | 2023, ref 2341906 |
| Unnamed siteGround-mounted | Cork County | 420 kW | Invalid application | 2025, ref 25/6300 |
Show 46 more applications
| Site | Council | Size applied for | Status | Planning record |
|---|---|---|---|---|
| Ballyhandle QuarryGround-mounted | Cork County | 420 kW | Granted | 2026, ref 26/0801 |
| Unnamed factory and industrial siteRooftop | Cork City | 337 kW | Granted | 2022, ref 2241671 |
| Unnamed warehouse and logistics siteRooftop | Cork County | 317 kW | Awaiting decision | 2016, ref 16/6002 |
| Unnamed warehouse and logistics siteRooftop | Cork County | 317 kW | Granted | 2016, ref 16/6280 |
| Unnamed factory and industrial siteRooftop | Cork County | 300 kW | Granted | 2018, ref 18/7056 |
| Unnamed food and drink processing siteRooftop | Cork County | 250 kW | Granted | 2017, ref 17/92 |
| Collins SuperValu, CarrigalineRooftop | Cork County | 236 kW | Built | 2022, ref 22/4892 |
| Avoncourt PackagingRooftop | Cork City | 216 kW | Granted | 2022, ref 2241608 |
| Unnamed factory and industrial siteRooftop | Cork County | 201 kW | Awaiting decision | 2017, ref 17/5675 |
| Unnamed food and drink processing siteRooftop | Cork County | 201 kW | Awaiting decision | 2017, ref 17/5989 |
| Folláin TeoRooftop | Cork County | 201 kW | Awaiting decision | 2017, ref 17/6399 |
| Avoncourt PackagingRooftop | Cork City | 199 kW | Granted | 2021, ref 2139886 |
| Irish International Trading CorporationRooftop | Cork City | 174 kW | Granted | 2023, ref 2342242 |
| Hurleys' SuperValuRooftop | Cork County | 153 kW | Granted | 2020, ref 20/5036 |
| Unnamed siteRooftop | Cork County | 129 kW | Granted | 2016, ref 16/6725 |
| Casey's HotelGround-mounted | Cork County | 70 kW | Granted | 2024, ref 24/102 |
| O'Brien's Service StationRooftop | Cork City | 573 m² | Granted | 2019, ref 1938584 |
| Unnamed siteRooftop | Cork City | 519 m² | Granted | 2020, ref 2039433 |
| Ryan's SuperValu, Grange RoadRooftop | Cork City | 819 m² | Granted | 2021, ref 2140272 |
| Unnamed factory and industrial siteRooftop | Cork City | 543 panels | Granted | 2021, ref 2140354 |
| Educate Together National School, Carrs HillRooftop | Cork City | 40 m² | Granted | 2021, ref 2140429 |
| Unnamed siteRooftop | Cork City | 753 m² | Granted | 2022, ref 2240868 |
| Ballyvolane Shopping CentreRooftop | Cork City | 1,847 m² | Granted | 2022, ref 2241026 |
| Blarney Waste Water Treatment PlantGround-mounted | Cork City | 486 m² | Granted | 2022, ref 2241082 |
| O'Leary's SuperValu, Tower Shopping CentreRooftop | Cork City | 735 m² | Built | 2022, ref 2241130 |
| Ryan's SuperValu, Crestfield CentreRooftop | Cork City | 319 m² | Built | 2022, ref 2241313 |
| Unnamed siteRooftop | Cork City | 1,759 m² | Granted | 2022, ref 2241412 |
| M.D. O'Shea & SonsRooftop | Cork City | 260 m² | Granted | 2022, ref 2241442 |
| Cnoc MhuireRooftop | Cork City | 222 panels | Granted | 2023, ref 2342212 |
| Unnamed factory and industrial siteRooftop | Cork City | 1,107 panels | Granted | 2023, ref 2342332 |
| Unnamed sports club siteRooftop | Cork City | Not stated | Granted | 2024, ref 2443010 |
| ESB Wilton Regional OfficeRooftop | Cork City | 1,200 m² | Granted | 2025, ref 2543635 |
| ALDI Bishopstown RoadRooftop | Cork City | 625 m² | Built | 2025, ref 2543809 |
| LidlRooftop | Cork County | 1,009 m² | Granted | 2018, ref 18/599 |
| Dano's SuperValuRooftop | Cork County | 455 m² | Granted | 2019, ref 19/5454 |
| Boherbue Co-Op Stores and SuperValuRooftop | Cork County | 1,172 m² | Granted | 2021, ref 21/4331 |
| Unnamed siteRooftop | Cork County | 1,088 m² | Granted | 2021, ref 21/5573 |
| Amber Service StationRooftop | Cork County | 277 m² | Granted | 2022, ref 22/4143 |
| O'Mahony's CentraRooftop | Cork County | 364 m² | Granted | 2022, ref 22/4911 |
| Unnamed siteGround-mounted | Cork County | 528 m² | Granted | 2022, ref 22/5263 |
| Unnamed siteRooftop | Cork County | 1,020 m² | Granted | 2022, ref 22/398 |
| Recordati IrelandRooftop | Cork County | 1,132 m² | Granted | 2022, ref 22/5411 |
| Unnamed factory and industrial siteRooftop | Cork County | 2,000 m² | Granted | 2022, ref 22/5456 |
| Fota Wildlife ParkRooftop | Cork County | 98 panels | Built | 2022, ref 22/5601 |
| Abbeylands Nursing Home and Alzheimer's UnitGround-mounted | Cork County | 308 panels | Invalid application | 2025, ref 25/6743 |
| Abbeylands Nursing Home and Alzheimer's UnitGround-mounted | Cork County | 308 panels | Granted | 2026, ref 26/1564 |
"Granted" is permission to build, not proof that the panels went up.
Which sports clubs in Cork have solar?
3 clubs and venues in Cork have installed solar, and 4 more have funding or plans. The sports clubs guide covers the grants they used.
| Club | Sport | Size | Status | Source |
|---|---|---|---|---|
| Munster Rugby, Virgin Media Park (Musgrave Park) | Rugby | 255 kW | Installed | Pinergy |
| St Finbarr's Hurling & Football Club, Togher | GAA club | 136 panels | Installed | Echo |
| Fermoy Swimming Pool | Pool or leisure centre | 170 panels | Installed | Construction Ireland |
| Carrigtwohill GAA | GAA club | Not stated | Funded | Community Sport Facilities Fund allocation list (RTÉ-hosted) |
| Muskerry RFC | Rugby | Not stated | Funded | Community Sport Facilities Fund allocation list (RTÉ-hosted) |
| St Vincent's Hurling & Football Club | GAA club | Not stated | Funded | Belfast City Council minutes |
| SuperValu Páirc Uí Chaoimh | GAA county ground | Not stated | Planned | Cork GAA |
Where to go next
- Solar projects in Cork, including homes and farms
- Commercial solar installation: the stages and what to check before hiring an installer